Planning Log
Keep a record of both what you intend to do and what you did over the course of the next 3 weeks as we work through the Technology Process.
Week 5 | Week 6 | Week 7 | |
What I plan to do | brainstorming | survey | designing signs, planning log |
Materials I will need | |||
People/Sources I need to consult for more information. | |||
What did you find difficult and why? | |||
What I will do next as a result of any difficulties. |
STAKEHOLDERS
The Stakeholders are the people who have an effect on the production of your product
The Primary Stakeholder is your client ie. the person or community of people that your sign is going to be created for. eg. ….
Wider Community Stakeholders: | Key Stakeholders: | Primary Stakeholder: |
Visitors | teachers students | me |
ATTRIBUTES: These describe the physical (what it is like) and functional (what it will do) characteristics of a product. These characteristics are key or essential for the successful function of a product and should be re- evaluated at each stage of the design process.
With your sign in mind, complete the following attributes table:
Attribute | Method of Measurement | Specification |
eg. Eye catching | sign will appeal (be noticed) by stakeholders | Sign must be clear, stand out and be creative |
Size | medium | sign must be large enough to stand out |
Colour | Bright colours | sign must have brown, white, black colours |
Create awareness (e.g. clear message) | no littering | message has to be clear |
Durable/ Weather resistant | Alamanate | sign must be laminated |
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.